What is Resource Scheduling in Project Management And How to Make This Process Seamless

Resource scheduling in project management

The success of any project depends on many factors but certainly includes the availability of competent workers, sufficient finance, facilities, equipment, and other necessary assets. This is where proper resource scheduling plays a dominant role.

Being a part of resource management, this cornerstone process ensures that all your assets are in the right place at the right time.

What insights do you need to have and which steps should you take to become a true resource scheduling guru?

By immersing yourself in this article, you can study the following:

What is resource scheduling?

Resource scheduling is the process of assigning available resources to various tasks and projects over a specific period in an efficient way. The main purpose of this process is to optimize the utilization of work assets to meet project deadlines, reduce costs, and guarantee that there’s no overloading or underallocation at any stage of a project.

According to the statistics (2023), 63% of companies completed their project within the provided budget and even less.

Image source: SaaSworthy

In many ways, this achievement was made possible thanks to high-quality resource scheduling at an early stage of project preparation.

Project management resource scheduling involves planning, controlling, and allocating resources such as facilities, labor, equipment, materials, and other assets available at the right time to complete the required tasks.

A clear example of this process is described by Ben Aston, a digital project manager and founder of thedpm.com:

What is the difference between resource planning and resource scheduling?

Resource planning and resource scheduling are crucial PM components. They both focus on the right utilization and allocation of work assets but target different phases of the resource management process. 

Let’s briefly explore a breakdown of their differences.

Resource planning

Resource scheduling

Why is resource scheduling important in project management?

Project specialists in many professional areas practice resource scheduling whether they call it by that name or not. 

As with any PM practice, resource scheduling must be high-quality and timely completed. Otherwise, problems and inferior processes cannot be avoided.

This is confirmed by the study conducted by the Project Management Institute (2020). It found that approximately 11.4% of all resources in the modern business landscape are wasted due to inferior PM processes.

Image source: PMI Pulse of Profession

Incidentally, resource planning is not solely crucial for resource managers, as it often falls within the scope of project managers’ duties as well.

This fine line of responsibility is not always easy to grasp, but, in any case, it is worth striving to improve this process. 

Donna Fitzgerald, the founder of Nimble PM and chief product evangelist at ProSymmetry agrees:

Detailing the importance of resource scheduling, it’s worth noting the points followed below.

The full puzzle of the resource planning importance will come together when you consider the benefits that this process provides.

Benefits of resource scheduling

Effective resource scheduling in project management enables the identification of appropriate resources for specific tasks. This strategic approach maximizes asset utilization and empowers collaboration, productivity, and overall project success.

Below is the list of the most vivid benefits of resource scheduling in project management.

All these benefits of resource scheduling enable organizations to deliver high-quality projects within budget and on schedule.

What are the well-known resource scheduling methods?

When responsible managers schedule tasks, they typically encounter two scenarios:

In both situations, two resource scheduling techniques in project management can assist in improving the team’s time and optimizing project completion.

Here are these resource scheduling methods in detail.

What should you consider to create a resource schedule?

Creating a productive resource schedule ensures that the right work assets are available at the right time to meet your project demands. This process involves generating a meticulous resource management plan, a deep understanding of the project scope, and an acute awareness of all project management resources at your disposal. 

What are the core requirements for efficient asset scheduling?

Let’s explore some key considerations for generating a reliable resource schedule.

Are these requirements sufficient to succeed in project management resource scheduling? It seems that they are enough.

Now let’s look at the specific steps to implement such a competent schedule.

How to create a resource schedule in 7 steps

As you understand from the insights above, resource scheduling is more than timelines and dates placed with a gut feeling. It is also about accurate resource availability and resource demand, as well as other critical details you may not find in the stack of docs on your desk. 

Still, we know how to create an outstanding resource schedule. Below are 7 consistent steps that will help you succeed.

1. Start with selecting a proper resource scheduling tool

Project management professionals know that scheduling resources manually is an inaccurate and exhausting process. By choosing appropriate resource scheduling tools, they can simplify their efforts and organize work assets efficiently.

However, statistics demonstrate that only 23% of organizations use PPM or resource management software solutions (2020).

Image source: Wellingtone

If you are looking for a robust PM tool with advanced features for resource scheduling, consider GanttPRO. 

The platform has gained trust among many professionals worldwide who are looking for the best software for Gantt charts.

GanttPRO is a frequent choice for managing assets within a single work process and also for improving resource planning for multiple projects.

Its online Gantt chart with resource allocation serves as a handy visualization system that lets project teams schedule, organize, assign, and control work assets with ease.

Project teams in various industries use GanttPRO for project planning, task organization, and resource scheduling, acknowledging it as professional resource management software.

Professionals involved in the project management environment widely apply this software to enhance task management, event planning, deadline control, internal and external collaboration, progress tracking, etc.

One of GanttPRO users, George Rossle, a production manager at A+ Construction Pro, shares his thoughts about the strengths of the platform:

2. Break down a project into manageable tasks

The next step after selecting your online PM tool is understanding your project as a whole and breaking it down into individual tasks. Experienced managers utilize a tool titled WBS work breakdown structure to arrange their work by breaking down all activities to the basic level. It results in a comprehensive set of all the tasks and subtasks that need to be done.

GanttPRO is also known as a fabulous WBS creator. It helps you to keep your tasks structured. You can take advantage of its handy drag-and-drop to quickly visualize any task dependency on your timeline and mark a key checkpoint which is known as a milestone in project management.

Once your task set is prepared, you can care about gathering your resources and their neat visualization.

3. Analyze resource availability & visualize required assets

Your project may need skilled professionals, specific software, hardware, materials, etc.

GanttPRO will help you gather and visualize the required resources intelligently.

A couple of clicks will allow you to attract certain team members, set costs and calendars for them, and specify their project roles. Additionally, you can create virtual resources including people, tools, facilities, materials, etc.

4. Assign teammates or resources to tasks

The next step is allocating resources and specifying workers, deadlines, and dependencies for the tasks you’ve added to your timeline. It is crucial to find out if anyone is overloaded with too much work while others may not have enough tasks.

Having the Gantt chart maker at hand and following one of the selected resource allocation methods, you can be sure that all your work assets are distributed properly based on their specific characteristics and availability. In GanttPRO, it’s possible to allocate one resource or several assets to each task.

Robust resource scheduling software

Manage tasks, schedule resources, and complete projects on time.

Sign up for free

This big picture allows project teams to provide stakeholders with accurate estimates of when and how things will be done.

5. Make resource scheduling your reliable assistant

After all these manipulations have been done, it’s time to take your resource scheduling to a professional level. It will be based on the availability of your team.

Managers should be able to provide accurate estimates of when things will be done for all stakeholders involved. They should have a complete overview of where and when certain tasks will be needed and when people with related skills and other resources will be available. 

For these aims, GanttPRO offers the option to configure personal calendars while assigning tasks to resources.

With their assistance, scheduling and tracking the daily activities or working hours of your resources becomes remarkably straightforward. You gain the ability to plan and manage working shifts, vacations, days off, seasonal holidays, and other dates.

6. Care about workload

Stress and demotivation are frequent companions of those workers who have to manage multiple projects simultaneously. It often leads to reduced productivity and causes missed work deadlines.

Clear workload management is what enables improved scheduling and management of project resources. GanttPRO stands as a trustworthy helper in this case. It enhances task tracking and facilitates the necessary adjustments in resource allocation to avoid underutilization or overloading.

7. Track and adjust resources (if needed)

Having your resources ready and the project in motion, it’s essential to focus on managing, tracking, and overseeing to maintain consistent success in resource scheduling. Try to track your project’s advancement closely to ensure it aligns with expected milestones.

In addition, regularly check your assets to prevent any scheduling conflicts. It’s a common case for team members to encounter obstacles they can’t overcome on their own. Therefore, paying attention to the allocation of resources and the time spent is vital to provide timely assistance.

Improve resource scheduling efforts with highly potential PM software

While resource scheduling may seem an overwhelming procedure, following certain steps and rules can simplify it and give you confidence your efforts are on track.

If you are committed to giving your team everything they need to succeed in resource scheduling, choose GanttPRO. This professional PM software offers comprehensive resource management capabilities. Its user-friendly interface, real-time data visualization, and advanced scheduling algorithms motivate teams to lead their projects to winning results.

Frequently asked questions about resource scheduling

  • Resource-based scheduling in project management refers to the practice of organizing project activities based on the availability and capacity of resources required to complete each task. It involves aligning human, financial, material, and other resources with project timelines to optimize efficiency and productivity.

  • There are two approaches to resource scheduling that reconcile asset limits and time constraints: resource smoothing (or time-limited resource scheduling) and resource leveling (or resource-limited scheduling). Each type of resource scheduling has its advantages and is used depending on the nature of a certain project, the complexity of resource requirements, and the preferences of a project team.